From large-scale VRF installs to data center mechanical work, contractors across the country choose the Reftekk system for its proven labor savings, fewer joints, and cleaner installs.
I estimate that we would have had 700–1,000 joints more if we had used a standard system. I estimate our install was at least 40% quicker than normal. We had 90% of the pipe installed prefabbed in our shop and delivered ready to install. The idea of bending instead of fittings is superior for many reasons — time savings, less leak potential, and better flow.
Josh Mares
Sr. Field Manager, Special Projects Healthcare — MTech Mechanical
This summer the bendable pipe process allowed me to install over 5 miles of copper tubing on time and under budget in 60 days. I find this process to be a much quicker application to install than press systems like Zoomlock. The bending process has allowed us to save more money and time while reducing fittings, brazed joints, and welding gases.
John Lundgren
Service Manager — AireMasters Air Conditioning
By utilizing the bending and swaging process along with the Reftekk piping, we eliminate approximately 60% of the brazed joints — less purge time and less opportunity for leaks. We highly recommend this product, and whenever possible, we utilize Reftekk piping for any refrigeration piping system.
Rod Marcum
President — YMC Inc.
We prefer to use the piping over any other brand. The ability to swage the piping during the install is a game changer for our company. I know for certain that our efficiency as a company has improved since using Reftekk pipe and would recommend it to anyone in the industry. It is pretty rare for us to install any other brand of pipe at this point.
Jordon Sorensen
Project Manager — Precision Air Management
Reftekk greatly improved our ability to prefabricate refrigerant pipe. The changes in direction can be made with the Digi-Bender, so there is no brazing taking place in our shop — reducing the need to set up purge assemblies. Each braze cup swaged with the tool cuts the number of brazed joints between lengths of pipe in half.
Jared Q.
Project Manager — Name withheld by request
Ready to see the Reftekk system in action? Contact us to request a demo or speak with a distributor near you.
Get in touch →